A novel approach was taken to cost-effectively close a 4.86 ha unlined industrial wastewater sludge lagoon in North Carolina and reduce leachate production. A floating geosynthetic cover system gave crews and equipment access to the lagoon surface.
December 25, 2017
A novel approach was taken to cost-effectively close a 4.86 ha unlined industrial wastewater sludge lagoon in North Carolina and reduce leachate production. A floating geosynthetic cover system gave crews and equipment access to the lagoon surface.